Home / Services / Deep Cleaning / Post-Construction Cleaning

Our Core Service

Post-Construction Cleaning in Dubai

Cement haze, paint spots, adhesive residue, silicone smears and fine construction dust removed properly, in the right order, so the finish underneath is not damaged. Quoted after an inspection per property, across Dubai, Abu Dhabi and Sharjah.

Quick Answer

What does post-construction cleaning cost in Dubai?

Post-Construction Cleaning starts quoted after inspectionCity Walk Cleaning Services. The exact figure is confirmed by an inspection before work begins, and every job finishes with a before and after photo report.

  • An inspection before any work is given
  • Fixed written quotation, no charges added later
  • Trained, insured, directly employed teams
  • Before and after photo report on completion
Scope of Work

What post-construction cleaning includes

  • Fine dust removed from every horizontal and high-level surface
  • Cement haze and grout film lifted from tiles and stone
  • Paint spots and adhesive residue removed from glass and frames
  • Silicone and sealant smears cleaned off sanitaryware
  • Sticker, label and protective film removal
  • Multiple passes, because construction dust always resettles
Our Method

Seven stages, every job

Inspection

We attend, measure and look at the actual condition rather than quoting from a photograph.

Fixed written quotation

You receive a written scope with every item named. It does not move unless you change the scope.

Scheduling and approvals

We book the slot, and where a building needs permits or a service lift, we arrange it.

Site protection

Floors, furniture, lifts and corridors are protected before any work begins.

The work itself

A named supervisor runs the job, and the crew follows a written task list.

Testing and checking

Anything measurable is measured. Anything concealed is photographed before it is closed.

Handover

We walk the property with you, close any snag on the spot, and send the photo report the same day.

FAQ

Post-Construction Cleaning, your questions answered

Because it sits in ceiling voids, AC returns and window tracks and drops for days. A single pass is never enough, which is why our scope includes returning passes rather than one visit.

Yes, with the correct product. Acidic descalers etch marble permanently, so stone gets a neutral treatment and, where the haze is bonded, a mechanical pass instead.

After construction, almost always. Fine dust is pulled into the return and redistributed every time the system runs, which is why post-build homes feel dusty however often they are cleaned.

Request an inspection for post-construction cleaning

Inspection, written scope, photo report on completion. Send us a message and we will confirm an inspection slot, usually the same day.