Home / Services / Facilities Management / Risk-Based Maintenance & Asset Criticality

Risk

Risk-Based Maintenance & Asset Criticality

Not every asset deserves the same attention. Criticality scoring puts the budget where a failure would actually hurt. Per assessment, quoted after an inspection.

Quick Answer

What does risk-based maintenance and asset criticality cost in Dubai?

quoted after an inspection, confirmed after a site survey. The asset count and visit frequency decide the final figure, and we survey before quoting rather than working from a floor plan.

  • Site survey before any contract is agreed
  • Fixed written scope and schedule, no charges added later
  • Trained, insured, directly employed teams
  • Documented completion record after every visit
Scope

What is included

  • Criticality scored on consequence of failure, not asset cost
  • Single points of failure identified across the register
  • Likely failure modes recorded per asset class
  • Maintenance frequency tuned to criticality
  • Low-criticality assets moved to run-to-failure where that is cheaper
  • A prioritised plan you can defend to a budget holder
FAQ

Risk-Based Maintenance & Asset Criticality, your questions answered

Setting maintenance frequency by what a failure would cost rather than treating every asset alike. A lobby AC failing is an inconvenience; the same failure in a server room is an outage. The two should never be on the same schedule.

Usually it redistributes rather than reduces. Critical assets get more attention and low-criticality ones get less, often with a modest net saving. Anyone promising a large cut is proposing to cut visits, not risk.

Yes, for cheap, non-critical, easily replaced assets with no safety consequence. Maintaining those on a schedule costs more than replacing them when they fail, and pretending otherwise inflates a contract.

Book a site survey

We walk the building, list the assets and put a written scope in front of you before anything begins.